THE PROJECT SCOPE
A local Elementary School was known to have lead-based paint on the canopies and the goal of the client was to stabilize all lead-based paint and paint over them during the Modernization project. A-Tech conducted full-time on site project monitoring of all stabilization that was being conducted.